1. Close the air gate and enshrine by an elastic band it in this provision. |
2. Open a butterfly valve and measure a gap From the air gate in this position of the gate. The gap of C has to conform to the requirements provided in subsection 6.1.1. |
|
3. For adjustment, being careful, turn in the part of draft shown in the drawing. At a uvula podgibaniye the gap to the right increases, and at a podgibaniye on the left – decreases. |
|