Models of 1,2 l |
1. Installation is made in the sequence, the return to removal, but at the same time it is necessary to use new laying. You make tightening of bolts of fastening of a collector gradually and evenly, since the middle to edges. |
L models 1,3, 1,4 and 1,6 |
2. Installation is made in the sequence, the return to removal, but at the same time it is necessary to use new laying. Tighten nuts of fastening of a collector gradually and consistently, beginning from the center to edge. At connection of a reception exhaust pipe to a final collector use new laying. |
|