1. Check that the piston of the first cylinder is in the top dead point. Check that two directing pins are installed in the block of cylinders. |
|
2. Check that new laying of a head of the block of cylinders has the same type, as the original, and establish laying so that marking of OBEN or TORAHS was directed up and settled down from a gear belt. |
3. Establish a head of the block of cylinders on the directing pins. |
|
4. Establish new bolts of fastening of a head of the block of cylinders and tighten them at this stage by hand. |
|
5. Gradually and in the sequence presented in the drawing tighten all bolts of fastening of a head of the block of cylinders the required moment in several stages. |
6. Further installation is made in the sequence, the return to removal, taking into account the next moments. |
|
7. At installation use new laying of a casing of the thermostat, collectors and a cover of a head of the block of cylinders. |
8. Establish a new gear belt. |
9. Tighten all bolts the required moment. |
10. Start the engine and warm up it up to the normal working temperature. Switch off the engine, uncover a head of the block of cylinders and tighten a final stage bolts of fastening of a head of the block of cylinders. |