85425ea0




10.2.5.2. Automatic transmission installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal taking into account the next moments.
2. If at removal from the hydrotransformer transmission liquid flowed out, fill in it to norm.
3. Wipe the hydrotransformer plug that at installation not to damage a sealing ring of an entrance shaft of the transmission, and check that the hydrotransformer was correctly combined with a pump shaft. For this purpose measure distance And which has to make 9,0–10,0 mm.
4. Otherwise turn and press the hydrotransformer for its combination with a pump shaft.
5. Apply a small amount of lubricant on the basis of a molybdenum disulfide on the directing plug of the hydrotransformer and the corresponding dredging in an end face of a bent shaft.
6. Combine a color tag on the hydrotransformer with a white tag on a plate of the drive and fix the hydrotransformer by bolts. Keep in mind that bolts of fastening of the hydrotransformer are not tightened yet, between the hydrotransformer and a plate of the drive there will be a gap equal to 0,4-1,5 mm.
7. Gradually and consistently tighten bolts of fastening of the hydrotransformer.
8. On the transmissions with the EF and EC codes intended for work without oil heater do not remove a cap from couplings of connection of pipelines of the oil heater.
9. Adjust a cable of the choice of transfers and a cable of compulsory inclusion of a low gear.
10. Fill in transmission liquid in the transmission.